Wiley
Wiley.com
Print this page Share

Preventive Maintenance for Higher Education Facilities: A Planning and Budgeting Tool for Facilities Professionals

ISBN: 978-0-87629-646-2
Binders, 3- or 5-ring
150 pages
May 2002
US $149.95 Add to Cart

This price is valid for United States. Change location to view local pricing and availability.

Preventive Maintenance for Higher Education Facilities: A Planning and Budgeting Tool for Facilities Professionals (0876296460) cover image
Other Available Formats: Paperback

Foreword.

Acknowledgments.

About the Authors.

Part One: PM in Higher Education Facilities: Selling the Need.

Introduction.

What is the Annual Cost of PM?

What is the Impact If PM is Not Implemented?

What is Required to Fully Implement a PM Program?

Business Process Analysis.

The PM Solution.

Part Two: Campus Building Models With Equipment.

How to Use the Building Models.

Administration Building Models.

Classroom Building Models.

Dormitory Building Models.

Gymnasium Building Models.

Laboratory Building Models.

Library Building Models.

Performing Arts Building Model.

Part Three: PM Standards/Checklists: Equipment Priority Levels, Maintenance Requirements, and Frequencies.

How to Use the PM Standards/Checklists.

PM7.1-110-1950: Elevator, Hydraulic, Passenger/Freight.

PM7.1-210-1950: Elevator, Cable, Electric, Passenger/Freight.

PM8.2-170-1950: Fire Protection System, Wet Pipe.

PM8.2-180-1950: Fire Protection System, Standpipe.

PM8.2-250-1950: Fire Pump, Electric Motor Driven.

PM8.2-270-1950: Fire Alarm Annunciator System.

PM8.2-275-1950: Fan, Roof Smoke Exhauster.

PM8.2-295-1950: Valve, Fire Protection.

PM8.3-120-2950: Boiler, Hot Water; Oil, Gas or Combination Fired.

PM8.3-120-3950: Boiler, Hot Water; Oil, Gas or Combination Fired.

PM8.3-120-4950: Boiler, Hot Water; Oil, Gas or Combination Fired.

PM8.3-160-4950: Boiler, Steam; Oil, Gas or Combination Fired.

PM8.3-160-4975: Boiler, Steam; Oil, Gas or Combination Fired.

PM8.3-710-3950: Pump, Steam Condensate Return.

PM8.4-015-1950: Centrifugal Pump.

PM8.4-020-1950: Pump, Storm Water, Simplex Lift Station.

PM8.4-020-2950: Pump, Storm Water, Duplex Lift Station.

PM8.4-120-1950: Air Compressor, Reciprocating.

PM8.4-120-2950: Air Compressor, Reciprocating.

PM8.4-160-1950: Air Handling Unit.

PM8.4-160-1975: Air Handling Unit.

PM8.4-160-2950: Air Handling Unit.

PM8.4-160-2975: Air Handling Unit.

PM8.4-220-2950: Chiller, Centrifugal Water Cooled.

PM8.4-230-2950: Chiller, Reciprocating, Air Cooled.

PM8.4-240-2950: Chiller, Reciprocating, Water Cooled.

PM8.4-510-2950: Cooling Tower, Forced Draft.

PM8.4-510-3950: Cooling Tower, Forced Draft.

PM8.4-710-3950: Fan, Axial, 36” to 48” Diameter.

PM8.4-710-3975: Fan, Axial, 36” to 48” Diameter.

PM8.4-735-1950: Fan, Roof/Wall Exhaust.

PM8.4-740-1950: Fan, Fume Hood, Utility, Exhaust.

PM8.4-760-1950: Fluid Cooler, 2 Fans (No Compressor).

PM8.4-810-1950: Package/Rooftop Unit, Air Cooled.

PM8.4-840-1950: Package Unit, Computer Room.

PM8.4-850-1950: Package/Rooftop Unit, with Duct Gas Heater.

PM8.5-110-1950: Backflow Prevention Device.

PM8.5-110-1975: Backflow Prevention Device.

PM8.5-110-2975: Backflow Prevention Device.

PM8.5-170-2950: Pump, Split-Case.

PM8.5-320-1950: Valve, Butterfly.

PM8.5-340-1950: Valve, Gate.

PM8.5-350-1950: Valve, Motor Operated.

PM8.5-355-1950: Valve, OS&Y.

PM8.5-370-1950: Valve, Sediment Strainer.

PM9.1-150-1950: Switchboard, Electrical.

PM9.1-210-1950: Automatic Transfer Switch.

PM9.2-110-1950: Motor Control Center, Electric.

PM9.3-105-2950: Generator, Emergency Diesel.

PM9.3-170-2950: Uninterruptible Power System.

Appendix/Index.

Return-on-Investment Models.

How Does Your PM Program Rate?

Integrating CMMS.

Resources.

Index.