CDM Regulations 2007 Procedures Manual, 3rd Edition

ISBN: 978-1-4051-4002-7
Paperback
208 pages
April 2008, Wiley-Blackwell
US $105.00 Add to Cart

This price is valid for United States. Change location to view local pricing and availability.

CDM Regulations 2007 Procedures Manual, 3rd Edition (140514002X) cover image
Other Available Formats: E-book

Section 1.

Introduction;.

Section 2 Application and interpretation.

2.1 Application; Table 2.1 The main responsibilities of duty holders; 2.2 Interpretation; 2.3 Additional exclusion.

Section 3 All duty holders.

3.1 Introduction; Table 3.1 Project management descriptors found in the regulations; Figure 3.1 Holistic diagram.

Section 4 The client .

4.1 Client fl owchart: all projects; 4.2 Client flowchart: notifi able projects, additional duties; 4.3 Client checklist; 4.4 Client checklist: notifi able projects.

Section 5 The designer.

5.1 Introduction; Figure 5.1 Regulations to be discharged by designers; 5.2 All projects; 5.3 Identifi cation; 5.4 Evaluation; 5.5 Contribution; 5.6 Design change; Figure 5.2 Systems approach for the designer; 5.1 Designer flowchart: all projects; 5.2 Designer flowchart: notifiable projects, additional duties; 5.3 Designer checklist: all projects; 5.4 Designer checklist: additional duties for notifi able projects.

Section 6 The contractor.

Figure 6.1 Contractor duties: all projects; 6.1 Contractor flowchart: all projects; Figure 6.2 Contractor: additional duties on notifi able projects; 6.2 Contractor fl owchart: notifi able projects, additional duties; 6.3 Contractor checklist: all projects; 6.4 Contractor checklist: notifi able projects, additional duties.

Section 7 The CDM co-ordinator.

7.1 Introduction; 7.2 Appointment; Figure 7.1 CDM co-ordination duties; 7.1 CDM co-ordinator flowchart; 7.2 CDM co-ordinator checklist.

Section 8 The principal contractor.

Figure 8.1 Regulations to be discharged by principal contractor; 8.1 principal contractor flowchart; 8.2 principal contractor checklist.

Section 9 Documentation .

9.1 Introduction; 9.2 Pre-construction information; Figure 9.1 Flow of pre-construction information and Pre-construction information: tender stage; 9.3 Construction phase plan; 9.4 Health and safety file; 9.5 Project risk register; 9.1 Project risk register (health and safety).

Section 10 Checklists and agendas.

10.1 Checklist for non-notifi able projects;10.2 Checklist of additional duties for notifi able projects; 10.3 Initial design/client meeting: prompt list; 10.4 Pre-start meeting: prompt list (non-notifiable projects); 10.5 Pre-start meetings: prompt list (notifiable projects); 10.6 Progress meeting: prompt list.

Section 11 Competence.

Web page directory.

Bibliography.

Index

Buy Both and Save 25%!

+

CDM Regulations 2007 Procedures Manual, 3rd Edition (US $105.00)

-and- Design Risk Management: Contribution to Health and Safety (US $77.95)

Total List Price: US $182.95
Discounted Price: US $137.21 (Save: US $45.74)

Add BOTH to Cart
Cannot be combined with any other offers. Learn more.