Skip to main content

CompTIA Project+ Study Guide Authorized Courseware: Exam PK0-003

CompTIA Project+ Study Guide Authorized Courseware: Exam PK0-003

Kim Heldman, William Heldman

ISBN: 978-0-470-64939-8

Jul 2010

360 pages

$32.99

Product not available for purchase

Description

Prepare for CompTIA's newly updated Project+ certification exam

CompTIA is offering the first major update to its Project+ certification in six years, and this in-depth study guide from project management industry experts Kim and William Heldman is the perfect preparation for the new exam. You'll find complete coverage of all exam objectives, including key topics such as project planning, execution, delivery, closure, and others.

  • CompTIA's Project+ is the foundation-level professional exam in the complex world of project management; certified project managers often choose to go on and obtain their Project Management Professional (PMP®) certifications as well
  • Provides complete coverage of all exam objectives for CompTIA's first update to the Project+ exam in six years
  • Covers project planning, execution, delivery, change, control, communication, and closure
  • Demonstrates and reinforces exam preparation with practical examples and real-word scenarios
  • Includes a CD with Sybex test engine, practice exams, electronic flashcards, and a PDF of the book

Approach the new Project+ exam with confidence with this in-depth study guide!

Note: CD-ROM/DVD and other supplementary materials are not included as part of eBook file.

(PMP and Project Management Professional are registered marks of Project Management Institute, Inc.)

Related Resources

Introduction.

Assessment Test.

Chapter 1 Initiating the Project.

Chapter 2 Project Process Groups and the Project Charter.

Chapter 3 Planning a Project.

Chapter 4 Schedule Planning.

Chapter 5 Communicating the Plan.

Chapter 6 Defining the Cost, Quality, and Risk Plans.

Chapter 7 Executing the Project.

Chapter 8 Processing Change Requests.

Chapter 9 Controlling the Project.

Chapter 10 Closing the Project.

Appendix What You’ll Find on the CD.

Glossary.

Index.

Login/Register for downloads

Thank you for your interest in this Sybex product. To access the free downloadable files, please login or register by clicking the following URL. You'll proceed to the login/registration screen.
Register or Login Now
After you have registered and downloaded your Sybex product's zip file, follow these steps:
  1. Unzip the downloaded file on your Windows or Mac computer.
    ** Note that the interface will not function properly unless you first unzip the file.
  2. Unzip the Windows or Mac zip file and click on start.exe (Windows) or start.app (Mac) to open the interface.
  3. Read through the license agreement, and then click the Accept button to browse the contents.
  4. If you experience trouble with the start.exe or start.app file or interface, please refer to the product ReadMe.txt file.
**Your files may become corrupt if Safari is set to automatically unzip downloads. If this happens, please follow these steps:
  1. Open Safari and navigate to Preferences.
  2. Click on the "General" tab.
  3. Unclick "Open "Safe" files after downloading."
  4. You may need to close and reopen Safari.
  5. After downloading the zip file to your computer, unzip and click on start.app.
CompTIA Voucher Discount
Download
ChapterPageDetailsDatePrint Run
IntroxxxiText correction: Errors in Answers to Assessment Test
The answer to Question 2 should be C., not B. The explanation is correct as written.

In the explanation accompanying the answer to Question 4., the reference to more information in Chapter 8 should be to Chapter 7.
5/22/12

115Text correction: Error in discussion of Net present value
Under Net present value, the fifth sentence:
"Each period's resulting sum in present-day dollars is added together, and that sum is then subtracted from the initial investment to come up with an overall value for the project." is in error. It should read:

"Each period's resulting sum in present-day dollars is added together. The initial investment is subtracted from that sum to come up with an overall value for the project."
5/15/13

6171Text correction: Multiplication error in Table 6.4
The Risk Score of Risk C is miscalculated. 0.8 × 0.1 = 0.08, not 0.8 as given in the table.
3/12/14